MeetingMinutes03052014: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 142: | Line 142: | ||
There is a lot of controversy regarding the erection of the slide | There is a lot of controversy regarding the erection of the slide | ||
*Dangerous | |||
*Needs repairs | |||
*Parts are in Reno | |||
'''Camp Size''' | '''Camp Size''' | ||
How big do we want to be. 40-45 campers. | How big do we want to be. 40-45 campers. | ||
*Half to 2/3 camp willing to put in a lot of work | |||
*Larger camp can be supported by current infrastructure | |||
*Dues – What is fair | |||
*Knowledge transfer from experienced autosubbers. | |||
**Phil – Rigging | |||
**Tish - Kitchen | |||
*How many people do we really need to do the minimum? | |||
Improvement Projects: | '''Improvement Projects:''' | ||
*DJ table with locking cover * | |||
*Proper DJ Vestibule that protects DJ’s * | |||
*Grey water tank | |||
*Rebuild netting yet again. | |||
*Dome parts replace damaged parts and make spares | |||
**Up-gauge horizontal members | |||
*Re-skinning dome with painted vinyl | |||
*New sign & exterior dome lighting | |||
*Hoop Skirt – possible redesign | |||
*Steam Bath rebuild | |||
*Shower – Bags didn’t work right, plugged heads. | |||
Steam & Smoke | '''Steam & Smoke''' | ||
Should we do it? Alone or with another camp? | |||
Where? Harbor Arts? | |||
When? | |||
Tools: | Tools: | ||
*Additional impact driver and adapters. | |||
Revision as of 18:10, 9 March 2014
Autosub Meeting – 03-05-2014 7:30pm – 9:00pm
In Attendance:
MEMBER | SKILL |
---|---|
Damon Hyde | Camp Leader |
Matt O. | |
Chelsea | |
Helen | Theatre tech, tools construction skills. |
Gougey | Early, Late, Sound & Ent. |
Jess | Project Mgmt, Possible kitchen |
Tawney | Anything but Kitchen Lead |
Ted | EMT, Medical, Safety |
Doug (Duggaloo) | Possibly Late Crew, helper bee, sound |
Matt | Safety, possible early kitchen help, lighting |
Jeremy | Entertainment, Booking |
Patrick (F’n Jimmy) | Dome erection lead, Early & Late |
Seph | Might be interested in more power and water |
Sabrina K. | Physical labor ok, early crew, possible kitchen |
Kathrine | |
Nate S. | Tools, building, design, interested in Early & Late. |
Jesse C. | Power, shock crew |
Emily | |
Sabrina R. |
Groundwork – Damon
Go with the Hive (if there are no objections)
Leadership Positions:
POSITION | MEMBER |
---|---|
Camp Leader: | Damon |
Early Crew Lead: | Doug R. |
Entertainment Pod: | Jeremy: |
Sound Pod: | Brian (Gougey) |
Kitchen: | |
B&G: | |
Power: | |
Water: | |
Dome erection: | |
Dome deco: | |
Safety: | Chelsea (interested), Ted (EMT) |
Bar: | |
Slide: | |
Steam Bath: | |
Late Crew Lead: | |
LNT: | |
Trash: | |
Virgin: |
Missing camp members this year: No Chuck Phil ??? No Liz No Tish No Fig No Pete Z. No Jenn Z.
Slide – Should we set it up again?
There is a lot of controversy regarding the erection of the slide
- Dangerous
- Needs repairs
- Parts are in Reno
Camp Size
How big do we want to be. 40-45 campers.
- Half to 2/3 camp willing to put in a lot of work
- Larger camp can be supported by current infrastructure
- Dues – What is fair
- Knowledge transfer from experienced autosubbers.
- Phil – Rigging
- Tish - Kitchen
- How many people do we really need to do the minimum?
Improvement Projects:
- DJ table with locking cover *
- Proper DJ Vestibule that protects DJ’s *
- Grey water tank
- Rebuild netting yet again.
- Dome parts replace damaged parts and make spares
- Up-gauge horizontal members
- Re-skinning dome with painted vinyl
- New sign & exterior dome lighting
- Hoop Skirt – possible redesign
- Steam Bath rebuild
- Shower – Bags didn’t work right, plugged heads.
Steam & Smoke
Should we do it? Alone or with another camp? Where? Harbor Arts? When?
Tools:
- Additional impact driver and adapters.
Wrap Up:
45 people last year, break-even point
20 min members to break-even on kitchen overhead